Factory made hot-sale Plastic Moulding Business - Remote control housing – Star Machining

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

continue on to further improve, to make sure product top quality in line with market and consumer standard requirements. Our firm has a excellent assurance program have already been established for Mould Injection Moulding, Plastic Injection Mold Design, Cnc Screw Machining, Should you be fascinated in any of our products and services, remember to do not hesitate to make contact with us. We're ready to reply you inside of 24 several hours soon after receipt of one's ask for and also to develop mutual un-limited advantages and organization in around potential.
Factory made hot-sale Plastic Moulding Business - Remote control housing – Star Machining Detail:

Product Specification

Product Name Remote control housing
Material ABS plastic
Manufacturing process Molding injection
Surface Treatment Burrs removing
Mold Cavity Single or multiple
Tolerance +/-0.02mm
Mold life 300,000~1000,000 shots
Surface Roughness Min Ra0.1~3.2
Drawing Accepted STP, STEP, LGS, XT, AutoCAD(DXF,DWG), PDF, or Samples
Usage Electronics
Lead Time 1-2 weeks for samples,3-4 weeks for mass production
Quality Assurance ISO9001:2015, SGS, RoHs
Payment Terms Trade Assurance, TT/PayPal/West Union

Star Machining Technology has served in consumer electronics industry for many years. We offer innovative prototyping and reverse engineering services, and we produce precision parts and complex assemblies for consumer electronics components such as projector housing, plastic shell,  and other precison plastic parts.

Packaging & Delivery

Packaging: One piece in a PE bag or with tissue paper, customized blistered packaging or corrugated clapboard packaging. Less than 22 KGS in a carton.

Delivery: The samples delivery is about 7~15 days and the lead time for mass production is about 25-40 days.

FAQ

● Does your company have any sort of quality certification?

Yes, we are ISO9001:2015 quality certified.
How long is the lead time for the mold?
It depends on the mold`s size and complexity. Normally the lead time is 25~35 working days. If the molds are very simple and not in big size we can work out within 15 working days.

● I have no 3D drawing, how should I star the new project?

You can provide us a sample we will help finish the 3D drawing design information

● Can I get a sample for check?

Sure, before mass production we will charge you some sample fee, when you confirm the order or tooling fee we can send you a sample for free.

● Do you design the products?

Product designs and drawings are provided by the customer.

● How can I be confident in your quality?

We have an established quality system and are committed to customer satisfaction and continual improvement. All our products are subjected to in-process inspections at various stages of production by well-trained and qualified operators.


Product detail pictures:

Factory made hot-sale Plastic Moulding Business - Remote control housing – Star Machining detail pictures

Factory made hot-sale Plastic Moulding Business - Remote control housing – Star Machining detail pictures

Factory made hot-sale Plastic Moulding Business - Remote control housing – Star Machining detail pictures


Related Product Guide:

Our primary intention should be to offer our clientele a serious and responsible enterprise relationship, delivering personalized attention to all of them for Factory made hot-sale Plastic Moulding Business - Remote control housing – Star Machining , The product will supply to all over the world, such as: Washington, Lahore, Sao Paulo, Although continuous opportunity, we have now developed serious a friendly relationship with many oversea merchants, such as ones through Virginia. We securely assume that the merchandise regarding t shirt printer machine is often good through a great number of having its good quality and also cost.
  • Product quality is good, quality assurance system is complete, every link can inquire and solve the problem timely!
    5 Stars By Myrna from Zurich - 2017.06.19 13:51
    It is really lucky to meet such a good supplier, this is our most satisfied cooperation, I think we will work again!
    5 Stars By Audrey from Greece - 2017.05.21 12:31
    Write your message here and send it to us
    .