Bottom price Injection Parts - Aluminum projector housing – Star Machining

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our advantages are lower prices,dynamic sales team,specialized QC,strong factories,high quality products and services for Plastic Part Design, Cnc Metal Parts, Swiss Machining Shafts, To learn more about what we can easily do in your case, make contact with us at any time. We glance forward to developing superior and long-term organization interactions along with you.
Bottom price Injection Parts - Aluminum projector housing – Star Machining Detail:

Product Specification

Product Name Aluminum projector housing
Material Aluminum 6061-T6
Manufacturing process CNC machining (CNC milling and cnc turning)
Surface Treatment Burrs removing
Tolerance +/-0.002~+/-0.005mm
Surface Roughness Min Ra0.1~3.2
Drawing Accepted STP, STEP, LGS, XT, AutoCAD(DXF,DWG), PDF, or Samples
Usage Projector
Lead Time 1-2 weeks for samples,3-4 weeks for mass production
Quality Assurance ISO9001:2015, SGS, RoHs
Payment Terms Trade Assurance, TT/PayPal/West Union

Star Machining Technology has served in consumer electronics industry for many years. We offer innovative prototyping and reverse engineering services, and we produce precision parts and complex assemblies for consumer electronics components such as projector housing, plastic shell,  and other precison plastic parts.

Packaging & Delivery

Packaging: One piece in a PE bag or with tissue paper, customized blistered packaging or corrugated clapboard packaging. Less than 22 KGS in a carton.

Delivery: The samples delivery is about 7~15 days and the lead time for mass production is about 25-40 days.

FAQ

● Does your company have any sort of quality certification?

Yes, we are ISO9001:2015 quality certified.
What else manufacturing process can you use for this projector housing
When the order quantity is larger, we suggest to use die casting manufacturing to make the blank part, and then do CNC machining.

● How quickly can I get my parts?

It depends upon the complexity, size and quantity. Quality parts can be made in as little as one week if all details are given. More complex parts requiring or other special features will take longer. We will give you an approximate delivery time in your quotation.
As for shipping, 3-7days by air-express. 15-30 days by ocean shipping globally.

● How much time do you need to give me a quote?

Usually, a quotation for a product is sent within 2 days after we receive the inquiry with all the necessary details.

● How can I be confident in your quality?

We have an established quality system and are committed to customer satisfaction and continual improvement. All our products are subjected to in-process inspections at various stages of production by well-trained and qualified operators.


Product detail pictures:

Bottom price Injection Parts - Aluminum projector housing  – Star Machining detail pictures

Bottom price Injection Parts - Aluminum projector housing  – Star Machining detail pictures

Bottom price Injection Parts - Aluminum projector housing  – Star Machining detail pictures

Bottom price Injection Parts - Aluminum projector housing  – Star Machining detail pictures


Related Product Guide:

We follow our enterprise spirit of "Quality, Efficiency, Innovation and Integrity". We aim to create much more worth for our buyers with our abundant resources, highly developed machinery, experienced workers and great providers for Bottom price Injection Parts - Aluminum projector housing – Star Machining , The product will supply to all over the world, such as: Ecuador, Seychelles, Borussia Dortmund, We follow superior mechanism to process these products that ensure optimum durability and reliability of the products. We follow latest effective washing and straightening processes that allow us to offer unmatched quality of products for our clients. We continually strive for perfection and all our efforts are directed towards attaining complete client satisfaction.
  • The company can think what our think, the urgency of urgency to act in the interests of our position, can be said this is a responsible company, we had a happy cooperation!
    5 Stars By Jocelyn from Pretoria - 2017.09.16 13:44
    We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
    5 Stars By Jean Ascher from Latvia - 2018.09.23 17:37
    Write your message here and send it to us
    .